Accomplishments

  • 1.   Street Lights :
  •               – Ensured 100% working of Street lights .
  •               – Damaged cables replaced
  •               – 54 nos Street Lights replaced with new lights (Found Damaged, broken and life over).
  • 2.    Parks :
  •               – Damaged walls reconstructed and plaster done
  •               – Paint done on walls and Railings in all parks
  •               – Missing gates restored for park 2
  •               – Street lights provided for Parks by Double lights mounting on poles .
  •               – 10 nos benches ensured through Hon. Chairman, next lot will be provided soon.
  • 3.    Water Line :
  •              – Purchased Electro fusion Welding machine for quick action on pipe leakages
  •              – Created and maintaining HDPE fittings stock .
  •              – Restored all leakages as and when reported
  • 4.    Electrical panels:
  •               – Street Light panels Autonomous maintenance
  •               – Damaged/worn out electrical parts replaced
  •               – Bypassed Contactor replaced to ensure power tripping in case of short circuit.
  •               – Panel Cleaning done
  •               -Cables dressing done and proper routing done to avoid damages to panel doors.
  • 5.Horticulture:
  •                – Brush cutter machine purchased and being regularly maintained .
  •                – All Empty plots/Green area grass cutting being regularly ensured
  •                – Weedicide chemical spray machine purchased, chemical regularly being sprayed
  •                – Tree trimming done after monsoon season .
  • 6.Roads :
  •               – Main road from gate (In/Out) constructed
  •               – Utkarsh internal roads repairing done
  •               – All potholes filled and breakers restored
  •              –  Road side Kerb stone painting done approx. 60% area covered . Remaining Work is in progress .
  • 7. Visual displays:
  •              – Haridwar Greens Main gate LED board provided
  •              – Main gate and walls Rustic painting done
  •              – Speed limit signage, NO parking sign board mounted
  •              – Direction board for school, tower, Club etc mounted
  • 8. Boundary wall & Lake Wall :
  •               – Work in ongoing , best quality work will be delivered
  • 9 . Drain/Rain water line
  •            – Damaged chambers re-constructed
  •            – Chock line cleaning done
  •            – Damaged Drain water line replacement in progress.
  • 10.  UPCL 11 KV Electricity Grid:
  •            – UPCL panel cleaning done from Grass
  •            – Electricity poles Touching tree cutting done time to time
  • 11. Animal/Reptile/Mosquito safety:
  •           – Snake catchers purchased and Approx 70 snakes captured and shifted out of society
  •           – Mosquito spray ensured n complete society
  •           – Wild animal Goe, Magarmach rescued
  •           – Application served to Municipal corp. for Dogs menace
  • 12. Housekeeping services:
  •           – Ensured 100% attendance and pickup of garbage throughout.
  •           – Regular maintenance of  Garbage cart to ensure smooth operation.
  • 13. Festival Celebrations:
  •           – Celebrated Independence day event
  •            – Diwali decorations, Diwali Sweets and gift distribution to staff and manpower.   
  • 14 . Provision of store and backup office
  •            – Contracted for store for storage of regular consumables
  •            – Serves as backup office to avoid work halt in periods of issues.
  • 15 . CAM payments transparency and Ease of residents:
  •           – Ensured Invoices being shared to each owner wherever possible every month
  •           – Ensured providing payment receipts from home without needs to visit maintenance office .
  •           – Shared updated record time to time in our social group .